WHBO Construction

  • 53 Andries Street
  • Wynberg Johannesburg, Gauteng
  • 2092
  • SOUTH AFRICA
  • +27 11 321 7200
PUBLIC PROFILE

WBHO Construction and Enterprise Development Continued..

Posted by Daniel Makhura on 18 September 2017 5:55 AM SAST
Daniel Makhura photo

More information about the above

The aim of WBHO’s ED Programme is
to develop the beneficiary to achieve
independent operational capacity at its
maximum potential level. The eD model
is designed to ensure that the support
which WBHO provides to the developing
organisation is slowly withdrawn in an agreed
and structured way, leaving a company that
can stand on its own two feet and succeed in the future.


Continuity of work is crucial for the sustained
growth of the beneficiary company, and
it is therefore ideal if our relationship is a
long-term one, ensuring that the developing
contractor has a continuous workflow to
facilitate growth with on-site guidance from
WBHO. This provides the ideal opportunity
for the eD beneficiary to gain exposure and
experience in the construction industry.
While WBHO has a moral obligation to
assist with the success of the developing
organisation, the cyclical nature of
construction is such that emerging
contractors cannot rely solely on WBHO for
work continuity. Beneficiaries are therefore
expected to utilise their new skills and seek
building contracts throughout the industry at large.

There are no comments

Sign in to add your comment.

Recent Posts